Forest Road 164 Reconstruction #61289
The 11.6-mile-long project area will be cleared and grubbed within 16 feet of the road centerline or as needed to create ditching. All cross-drain culverts will be replaced with polymer coated arch pipes. The entire road length will be resurfaced.
Sorry, the Project #61289 Public Reading Room is not active.