Lower South Fork McKenzie River Floodplain Enhancement #43959
The project would reconstruct portions of the mainstem and side channels, by adding gravel and over 3000 pieces of wood to the stream and floodplain. Several levees and rip-rap would be removed to improve floodplain access.
Sorry, the Project #43959 Public Reading Room is not active.