Creating a strategically located fuel break along the Idaho Power transmission line and Forest System Roads within the wildland-urban interface (WUI) to increase the defensible space of the transmission line outside of the Idaho Power right-of-way.
To download all letters in the Reading Room, please click the Download All Letters button. For larger downloads, you will be prompted to enter your email address and a link to the download will be sent to you once the zip file has been generated.