FSM 2740 Vegetation Management Pilot Projects #ORMS-2717

The Forest Service will publish a proposed directive to update the agency’s special uses administration manual to enhance the reliability of the electric grid and reduce the threat of wildfire due to vegetation-related conditions adjacent to electric transmission and distribution line (powerline facility) rights-of-way. The changes will establish guidance for allowing electric utilities to conduct voluntary vegetation management in areas up to 200 feet (150 feet on either side) from a powerline facility right-of-way. The directive is designed to implement section 8630 of the Agriculture Improvement Act of 2018 (Farm Bill). Section 8630 of the 2018 Farm Bill gives the Forest Service discretion to issue permits for conducting vegetation management pilot projects under lower liability standards to holders of an authorization for a powerline facility or natural gas pipeline on NFS lands that are not covered by the special use authorization for the powerline facility or natural gas pipeline. Pilot projects must be conducted outside the linear right-of-way for the associated powerline facility or natural gas pipeline; may not extend more than 150 feet from either side of the powerline facility or natural gas pipeline; and may not have a total width of more than 200 feet including both sides of the powerline facility or natural gas pipeline. In addition, pilot projects may not overlap with vegetation management conducted under the special use authorization for the powerline facility or natural gas pipeline, including removal and pruning of hazard trees outside the linear right-of-way for a powerline facility. The liability provisions in a special use permit for a pilot project have no effect on the liability provisions in the special use authorization for the powerline facility or natural gas pipeline, including the liability provisions that apply to removal and pruning of hazard trees inside and outside the linear right-of-way. The new manual requires the addition of clauses to Handbook Chapter 50 to be used in permit forms that legally authorize pilot projects on National Forest System lands. --- 2/10/2022: The Forest Service is issuing final directive, Forest Service Manual 2740 – Vegetation Management Pilot Projects Powerline Facilities, implementing section 8630 of Agriculture Improvement Act of 2018, which created a voluntary pilot project program for removal of vegetation near powerline rights of way on National Forest System lands. The directive establishes Agency procedures to enhance the reliability of the electric grid and reduce the threat of wildfire due to vegetation-related conditions adjacent to powerline facility rights-of-way. Approved vegetation management pilot projects will allow electric utilities to conduct voluntary vegetation management in areas up to 200 feet (150 feet on either side) from a powerline facility right-of-way. The final directive is being published in accordance with 36 CFR part 216.

The Forest Service values public participation. Communications from the public regarding this project, including commenters' names and contact information, will become part of the public record. Comments, including anonymous comments, will be accepted at any time. However, comments posted after the close of a designated comment period may not be able to be given full consideration.

---

2/10/2022:  The Forest Service is issuing final directive, Forest Service Manual 2740 – Vegetation Management Pilot Projects Powerline Facilities, implementing section 8630 of  Agriculture Improvement Act of 2018, which created a voluntary pilot project program for removal of vegetation near powerline rights of way on National Forest System lands.  The directive establishes Agency procedures to enhance the reliability of the electric grid and reduce the threat of wildfire due to vegetation-related conditions adjacent to powerline facility rights-of-way.  Approved vegetation management pilot projects will allow electric utilities to conduct voluntary vegetation management in areas up to 200 feet (150 feet on either side) from a powerline facility right-of-way.  The final directive is being published in accordance with 36 CFR part 216.



To download all letters in the Reading Room, please click the Download All Letters button. For larger downloads, you will be prompted to enter your email address and a link to the download will be sent to you once the zip file has been generated.


First Name search tooltip Organization Name search tooltip
Last Name search tooltip Keyword search
 


Check All Download Checked Letters
Results Per Page:
 DownloadAuthor NameOrganization NameDate Submitted(sorted ascending)Size

Other (FSM 2740)

 bishop, steve  01/02/20211 KB [id:3714]Other (FSM 2740) (Total Letters: 4)
 Myers, Karl Tri-State Generation and Transmission Association, Inc.01/06/20211 KB [id:3714]Other (FSM 2740) (Total Letters: 4)
 Gingerich, Matt NV Energy01/11/20211 KB [id:3714]Other (FSM 2740) (Total Letters: 4)
 Rowe, Carly Xcel Energy01/11/2021128 KB [id:3714]Other (FSM 2740) (Total Letters: 4)
Displaying items 1 - 4 of 4

Download Checked Letters





Disclaimer: Letters that may contain proprietary or sensitive resource information, or that may be otherwise sensitive, are automatically withheld from displaying in the reading room pending human review. Letters received, but not accessible here, will still be considered and included as part of the record for this project. Most flagged letters are cleared for posting within a few days of being received. Posting may also be delayed for comments not submitted via the web form (e.g., email, mail or fax).