Go back to main project page

Bagley Dam Decommissioning #65167

This project consists of demolishing Bagley Dam, installing a recreational trail bridge at the current dam site, re-routing a small section of the Bagley Lakes Loop trail, and stream channel reconstruction.


To download all letters in the Reading Room, please click the Download All Letters button. For larger downloads, you will be prompted to enter your email address and a link to the download will be sent to you once the zip file has been generated.


First Name search tooltip Organization Name search tooltip
Last Name search tooltip Keyword search
 


Check All Download Checked Letters
Results Per Page:
 DownloadAuthor NameOrganization NameDate SubmittedSize

Scoping (Bagley Dam Scoping)

 Elliot, Crystal Trout Unlimited01/16/2024106 KB [id:5550]Scoping (Bagley Dam Scoping) (Total Letters: 5)
 Baum, Laurel  01/16/20242.32 MB [id:5550]Scoping (Bagley Dam Scoping) (Total Letters: 5)
 DeCramer, Michael  01/16/20241 KB [id:5550]Scoping (Bagley Dam Scoping) (Total Letters: 5)
 Anon, Anon  12/31/202344 KB [id:5550]Scoping (Bagley Dam Scoping) (Total Letters: 5)
 Scarborough, Jim North Cascades Conservation Council12/28/20231 KB [id:5550]Scoping (Bagley Dam Scoping) (Total Letters: 5)
Displaying items 1 - 5 of 5

Download Checked Letters





Disclaimer: Letters that may contain proprietary or sensitive resource information, or that may be otherwise sensitive, are automatically withheld from displaying in the reading room pending human review. Letters received, but not accessible here, will still be considered and included as part of the record for this project. Most flagged letters are cleared for posting within a few days of being received. Posting may also be delayed for comments not submitted via the web form (e.g., email, mail or fax).